Under the new normal economic situation, with the transformation of the national economic development mode, the main contradiction in the development of Xinjiang's power industry is that the power generation capacity does not match the social demand, and the power generation capacity is seriously excessive. According to this, Xinjiang has put forward the work plan of "electrified Xinjiang". In the field of construction, it has proposed to solve the problem of power abandonment and overcome the contradiction of power development in Xinjiang by developing electric heating schemes such as heating cables, regenerative electric boilers, heat pumps and so on. Taking the construction of the new campus of Xinjiang University as an example, this paper puts forward two feasible electric heating schemes and compares their economy, in order to promote the pace of replacing traditional energy heating with new clean energy.
Published in | Journal of Electrical and Electronic Engineering (Volume 7, Issue 1) |
DOI | 10.11648/j.jeee.20190701.14 |
Page(s) | 29-35 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2019. Published by Science Publishing Group |
Electrification, Electric Heating, Clean Energy
[1] | Li Lixin. Electric power substitution should rise to national strategy [N]. China Electric Power Daily, 2014-03-06 (004). |
[2] | Chen Bo. Brief analysis of the development prospects of wind power heating in Xinjiang [J]. Building materials and decoration, 2017 (25): 179. |
[3] | Liu Yang, Ran Chunyu. A comparative study of electric heating and gas heating [J]. Journal of Chifeng University (Natural Science Edition), 2016, 32 (22): 171-173. |
[4] | Chen Haoli. Study on selection and benefit analysis of electric heating scheme in Kuitun City [D]. North China Electric Power University, 2015. |
[5] | Gong Jianguo. Discussion on the application of water-storage thermoelectric boilers as heating sources for small and medium-sized buildings [J]. Enterprise Technology Development, 2013, 32 (11): 21-22. |
[6] | Tangshan, Yi Jun. Heat supply system of regenerative boiler and its technical and economic application [J]. Engineering technology research, 2017 (11): 111-112. |
[7] | Chenna, Tang Yuanming. Application Research of Environmental Protection and Energy Saving Ground Source Heat Pump Technology [J]. Environmental Protection and Circular Economy, 2008 (12): 34-37. |
[8] | Li Deying. Heating Engineering [M]. Beijing: China Construction Industry Press, 2004. |
[9] | Long Weiding, Wuyong. Building Energy Saving Technology [M]. Beijing: China Construction Industry Press, 2009. |
[10] | He Mengchun. Economic comparison of different heating modes for residential buildings in central heating areas [J]. Energy-saving technology, 2008 (04): 340-346. |
[11] | Zhang Jian, Wu Liang, Yuan Xinrun. Application analysis of decentralized electric heating in Tianjin [J]. DSM, 2015, 17 (06): 33-36. |
[12] | Sun Yong, Yan Gangui, Zheng Taiyi, Fengke, Yang Guoxin, Li Junhui, Wang Zongbao. Economic analysis of wind abandonment in regenerative electric heating under the background of power market [J]. Energy Storage Science and technology, 2016, 5 (04): 532-538. |
APA Style
Li Jianwei, Zhang Xinyan, Xu Jizhi. (2019). Research Program of Electric Heating in Xinjiang Area Considering Feasibility and Economy. Journal of Electrical and Electronic Engineering, 7(1), 29-35. https://doi.org/10.11648/j.jeee.20190701.14
ACS Style
Li Jianwei; Zhang Xinyan; Xu Jizhi. Research Program of Electric Heating in Xinjiang Area Considering Feasibility and Economy. J. Electr. Electron. Eng. 2019, 7(1), 29-35. doi: 10.11648/j.jeee.20190701.14
AMA Style
Li Jianwei, Zhang Xinyan, Xu Jizhi. Research Program of Electric Heating in Xinjiang Area Considering Feasibility and Economy. J Electr Electron Eng. 2019;7(1):29-35. doi: 10.11648/j.jeee.20190701.14
@article{10.11648/j.jeee.20190701.14, author = {Li Jianwei and Zhang Xinyan and Xu Jizhi}, title = {Research Program of Electric Heating in Xinjiang Area Considering Feasibility and Economy}, journal = {Journal of Electrical and Electronic Engineering}, volume = {7}, number = {1}, pages = {29-35}, doi = {10.11648/j.jeee.20190701.14}, url = {https://doi.org/10.11648/j.jeee.20190701.14}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.jeee.20190701.14}, abstract = {Under the new normal economic situation, with the transformation of the national economic development mode, the main contradiction in the development of Xinjiang's power industry is that the power generation capacity does not match the social demand, and the power generation capacity is seriously excessive. According to this, Xinjiang has put forward the work plan of "electrified Xinjiang". In the field of construction, it has proposed to solve the problem of power abandonment and overcome the contradiction of power development in Xinjiang by developing electric heating schemes such as heating cables, regenerative electric boilers, heat pumps and so on. Taking the construction of the new campus of Xinjiang University as an example, this paper puts forward two feasible electric heating schemes and compares their economy, in order to promote the pace of replacing traditional energy heating with new clean energy.}, year = {2019} }
TY - JOUR T1 - Research Program of Electric Heating in Xinjiang Area Considering Feasibility and Economy AU - Li Jianwei AU - Zhang Xinyan AU - Xu Jizhi Y1 - 2019/03/08 PY - 2019 N1 - https://doi.org/10.11648/j.jeee.20190701.14 DO - 10.11648/j.jeee.20190701.14 T2 - Journal of Electrical and Electronic Engineering JF - Journal of Electrical and Electronic Engineering JO - Journal of Electrical and Electronic Engineering SP - 29 EP - 35 PB - Science Publishing Group SN - 2329-1605 UR - https://doi.org/10.11648/j.jeee.20190701.14 AB - Under the new normal economic situation, with the transformation of the national economic development mode, the main contradiction in the development of Xinjiang's power industry is that the power generation capacity does not match the social demand, and the power generation capacity is seriously excessive. According to this, Xinjiang has put forward the work plan of "electrified Xinjiang". In the field of construction, it has proposed to solve the problem of power abandonment and overcome the contradiction of power development in Xinjiang by developing electric heating schemes such as heating cables, regenerative electric boilers, heat pumps and so on. Taking the construction of the new campus of Xinjiang University as an example, this paper puts forward two feasible electric heating schemes and compares their economy, in order to promote the pace of replacing traditional energy heating with new clean energy. VL - 7 IS - 1 ER -